R-ProField casesCooling towers

Steel Structure/Pipe Corrosion — pH Management Failure

Likely causes

Acidic operation below pH 6.5 — iron ion dissolution and uniform corrosion

Check: Measure pH precisely with digital meter (exclude test strips with ±0.5 error) — below 6.5 = immediate neutralization needed

What to do: Immediately adjust circulating water pH to target 7.5–8.2 — dose NaOH or soda ash → molybdate 10–20 ppm or zinc/phosphate combination treatment

Dissimilar metal contact — galvanic corrosion (copper/aluminum fins and carbon steel)

Check: Visually inspect dissimilar metal contact areas — check for pitting or concentrated reddish-brown rust

What to do: Isolate dissimilar metal contacts with insulating gaskets or plastic bushings → grind corroded areas and repair with epoxy coating or zinc spray

Excess chlorine dosing (residual Cl₂ >1.0 ppm) — induces pitting on stainless surfaces

Check: Measure residual chlorine — above 1.0 ppm = pitting risk on stainless; visually inspect stainless parts for pitting

What to do: Maintain residual chlorine 0.3–0.8 ppm → verify auto-dosing system settings → patch existing pitting with epoxy temporarily, then plan long-term replacement

Field tip

Field test strips have ±0.5 pH error — calibrate a digital pH meter monthly and use it for precise readings.

All 565 cases work offline in R-Pro, with error codes for 62 brands and P-T data for 108 refrigerants.

Open R-Pro →

Related cases