Electric Heater Defrost Overtime → Evaporator Thermal Shock and Case Deformation
Likely causes
Defrost termination sensor (thermistor) open-circuit or misconnected → heater runs to max timer without temperature sensing
Check: Measure sensor terminal resistance: ~10kΩ at 0°C, ~6.8kΩ at +10°C. ∞ or 0Ω indicates open/short
What to do: Replace thermistor with same-spec NTC 10kΩ@25°C if open/short → recheck wiring → verify operation
Defrost termination setpoint too high (above +20°C) → heater overheats
Check: Check defrost termination setpoint in controller menu (normal +8 to +12°C)
What to do: Set termination temperature to +8–+12°C → confirm backup timer is ≤25 min
No maximum time limit set on backup timer → heater runs excessively long
Check: Check timer settings — verify maximum defrost time is set to ≤25 min
What to do: Set maximum defrost time to 25 min → ensures forced cutoff after 25 min even if temperature sensor fails
Setting the backup timer to 25 min is the minimum field safety net — even if the termination sensor fails, defrost is forced off after 25 min.
All 565 cases work offline in R-Pro, with error codes for 62 brands and P-T data for 108 refrigerants.
Open R-Pro →Related cases
- Aging Room Humidity Control Failure (Unable to Maintain 85~95%RH)
- Ethylene Buildup in Meal Kit/Produce Warehouse — Over-Ripening Due to Ventilation Failure
- End-Zone Temperature Rise (Uneven Cooling)
- Air Curtain Weakening
- Excessive Temperature Rise After Defrost
- Excessive Heat Load from Direct Sunlight or Lighting